Showing 1 - 11 of 11
Meeting Local Content Requirements with a Modular Motion Control Solution

Meeting Local Content Requirements with a Modular Motion Control Solution

In 2019, Rheinmetall Defence Australia was awarded a contract to provide a replacement of the Australian Army’s Light Armoured Vehicle in support of Phase 2 of the Land 400 project.

02/08/2024
Extending the Lifecycle of an End-of-Life (EOL) Product

Extending the Life of an EOL Product

A defense contractor contacted Curtiss-Wright looking to find a proactive approach to manage obsolete components, qualify alternative components, and test infrastructure.

11/27/2023
Aiming Stabilization

Proven Aiming and Stabilization Brings Maximum Effectiveness from Land to Sea

Discover how one customer harnessed the power of a purpose-built motion control system to successfully deliver a unique solution to navies around the world.

07/27/2022
Preventing Costly Downtime in Advanced Manufacturing Machinery with Field-Proven COTS Modules

Preventing Costly Downtime in Advanced Manufacturing Machinery with Field-Proven COTS Modules

When a VME computing module in its product line went obsolete, a semiconductor machinery manufacturer turned to Curtiss-Wright for a high-performance VME replacement fit for the rigors of a grueling 24/7 production schedule. Read more about it here.

11/14/2018
Maximizing Processing Power in SAR Applications

Maximizing Processing Power in SAR Applications

A customer building the next generation synthetic aperture radar (SAR) faced challenges in delivering an enormous amount of processing power in a compact, lightweight solution. Read about the solution Curtiss-Wright developed here.

06/14/2018
Rugged CameraLink using Xilinx Kintex-7 FPGA

Rugged CameraLink using Xilinx Kintex-7 FPGA

Curtiss-Wright was recently challenged to provide a direct CameraLink interface to a Kintex-7 FPGA without the need for ChannelLink transceivers, thereby allowing an existing “generic” digital FPGA solution to be used. Read about the solution we developed.

12/20/2017
Harnessing the Power of AltiVec in Modern COTS Applications

Harnessing the Power of AltiVec in Modern COTS Applications

A customer approached Curtiss-Wright requiring a radar processing tech refresh for their aging fleet of fast jets. Learn about the solution we developed here.

07/04/2017
Ship-to-Ship Communications Tech Refresh

Ship-to-Ship Communications Tech Refresh

A customer wanted to update their ship-to-ship communications system. Read about the solution Curtiss-Wright developed that saves them money, support hours, and allows them to use new technology with existing systems without added expense and time.

05/04/2017
The Bigger Picture for Radar Sub-systems

The Bigger Picture for Radar Sub-systems

A customer approached Curtiss-Wright to develop a Radar system, with high-performance FPGA processing and integration of other system function all wrapped up in a rugged system. Read about the solution we developed here.

04/10/2017
Upgrade Airborne Radar within Power, Cost & Temp Constraints

Upgrade Airborne Radar within Power, Cost and Temp Constraints

To remain competitive, a Curtiss-Wright customer needed to upgrade an existing radar system that was deployed across multiple airborne platforms. A critical part of the upgrade was doubling the system’s signal processing throughput.

02/02/2017
Pods: Bridging the SWaP-constrained Gap Between Old and New

Pods: Bridging the SWaP-constrained Gap Between Old and New

A customer approached Curtiss-Wright with a requirement of upgrading to modern COTS hardware while keeping legacy proprietary infrastructure. Read about the SWaP solution Curtiss-Wright developed here.

01/27/2017