Showing 1 - 5 of 5
Meeting Local Content Requirements with a Modular Motion Control Solution

Meeting Local Content Requirements with a Modular Motion Control Solution

In 2019, Rheinmetall Defence Australia was awarded a contract to provide a replacement of the Australian Army’s Light Armoured Vehicle in support of Phase 2 of the Land 400 project.

02/08/2024
Aiming Stabilization

Proven Aiming and Stabilization Brings Maximum Effectiveness from Land to Sea

Discover how one customer harnessed the power of a purpose-built motion control system to successfully deliver a unique solution to navies around the world.

07/27/2022
Rugged CameraLink using Xilinx Kintex-7 FPGA

Rugged CameraLink using Xilinx Kintex-7 FPGA

Curtiss-Wright was recently challenged to provide a direct CameraLink interface to a Kintex-7 FPGA without the need for ChannelLink transceivers, thereby allowing an existing “generic” digital FPGA solution to be used. Read about the solution we developed.

12/20/2017
The Bigger Picture for Radar Sub-systems

The Bigger Picture for Radar Sub-systems

A customer approached Curtiss-Wright to develop a Radar system, with high-performance FPGA processing and integration of other system function all wrapped up in a rugged system. Read about the solution we developed here.

04/10/2017
Upgrade Airborne Radar within Power, Cost & Temp Constraints

Upgrade Airborne Radar within Power, Cost and Temp Constraints

To remain competitive, a Curtiss-Wright customer needed to upgrade an existing radar system that was deployed across multiple airborne platforms. A critical part of the upgrade was doubling the system’s signal processing throughput.

02/02/2017